- Messages
- 2,962
- Location
- Long Island, ny
- Thread starter
- #141
Basically, I used the inner bulkhead, inner hinge pin holder and shock tower uprights but I might be scrapping the uprights also. Most of the box was hpi front end partsSo you took a box of trash and replaced it with all new parts?
Got the front shocks rebuilt with all new internals and plastics. Waiting on extended shock ends and heavier springs to rebuild the rear shocks. gas tank is in. Still waiting on axles and hubs for the front and some parts for the rear.
Last edited: