Haric’s kraken vekta.5 lse build

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, and others.
Had to straighten out the pipe mount and add a spacer. if you’re running the new samba pipe you might have to do this. The pipe mount is made out of hot rolled steel, and soft as fekk. I was too lazy to heat it up to a cherry red and dip it in water to strengthen it. Maybe next time
69FEF9A2-55A7-426C-A590-E9CF1E5207A2.jpeg
7AFECC87-FD39-4A3C-864D-7DC8EC8B8EE0.jpeg
straightened it out on the milling vise
7A2FF368-1EAB-4A79-B393-E24167022D60.jpeg
Good enough
90A8DDE3-B96E-4674-83AD-5003DA9D04FA.jpeg
Now it looks better
85A46881-9DDF-420C-9355-55B711A78902.jpeg
 
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks