Do you bash🤷‍♂️

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, and others.
Damn good half days running at the new 5th scale track built at HRCT, they used to have the 1/8 scale and 5th scale running on same track, we now have own dedicated track. We are still to finalise the layout but we had a play with the layout in the video.
It's all freshly dug so needs to polish up and settle in. Was great fun and I only broke a clutch spring, 10 mins spannering and back up and running. Track was super dusty, but once home I checked intake and it was as clean as you'd want it to be.



20210718_154430.jpg


 
Last edited:
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks