well i have a heap of stuff coming still, but the only stuff i need to get it in the water now is the quickdraw 25ht motor im told it will be finshed and sent express this friday if all goes to plan, then all i need is the cc racing orders to get here and they are on the way express shipped.
once i have the cc racing orders i can set up the throttle and rudder servo, install the twin pick up rudder and sort out my tacho mount and push rods, water outlets and seals and so on.
the the other stuff like digital squish band gauge, alloy gas can adaptor, a hard fuel take to try out and some shinny stuff can be installed/used later and are not realy important to get this seaducer cat in the water.
i have also brought a new dremel with 90 degree atachment to help finsh the build and make my life a little easyer this should be here soon as it was brougt from online in australia and i saved good money buying it from online also, but i wont count my chickedn untill its here in my hands and working.
so realisticly the cat is around 3 weeks from being finshed, i need to give around 2 weeks shipping time and around 1 week of time in the shed rebuilign and refitting and give myself some resurch time.
but its getting there, i know this thread is dull cause its going so slow, but ive needed the time to resurch and same as much money as i can to buy the ebst stuff i can as cheap as i can as ive gone over budget by atlest $1200 aud so ive had to wait for some money to come in and sell off some stuff to keep funding this cat liek the rcmk evo motor and qd/red line hot pipe and some used servo,s
it will come together soon, and there will be loads of fisnhed, run pictures and some running vids soon.